Services

  • Job before with 3-tab
  • Installing valley metal & underlayment
  • Job after with laminate
  • Gaf/Elk Timberline 30 H.D. Barkwood
  • Tear off
  • StormMaster Slate
    Hearthstone Slate

COMPLETE ROOF REPLACEMENT


From new roofs to re-roofs, attic ventilation to soffit vents, we have you covered. We specialize exclusively in residential properties, and recognize the extra care they require.


A complete roof replacement begins with preparation:


  • Weather Check: We always try our best to keep up with the weather, watching forecast up to 15 days in advance. We use many different local and government sources but guessing weather is still a crap shoot. If the chance of rain is above 30% we will not start the job. Below this we may start with your approval in which case we will only remove & replace sections. Just in case we have tarps on hand as an extra measure. Other weather issues like cold and heat can make a huge impact on a the quality of installation. Depending on the time of year we can explaine this at the time of your job.
  • Careful use of tarps to protect your landscape features and grass areas, as much as possible.
  • Moving patio furniture, grills, etc. out of the work area (and setting them back in place after the job is done).
  • Trimming tree limbs off of the roof in order to complete the contracted work.
  • Tearing off old materials. This includes shingles, sometimes multiple layers, and underlayment if necessary.
  • Replacement or adding to decking, depending on the job.
  • Tearing out valleys to the deck level.
  • Removal of all roof accessories
  • Smoothing out the decking of nails, staples shingle pieces etc., so that the deck inspection may be done and a perfectly smooth deck is prepared for the new materials.

Next, the installation of new materials includes:


  • Installation of required underlayment, depending on roof pitch, along with all valleys.
  • 20" metal is always used in all valleys.
  • Cold Laminates and ice/water shields will be installed if required.
  • All flashing is inspected, replaced as needed, or added if missing. This includes flashings around chimneys, walls, skylights etc.
  • Ventilation upgrades will be done at this time. See comments on Roof/Soffit Ventilation
  • Installation of high quality composite shingles will be done per the manufacturer's requirements. Our installation includes the use of nails, not staples. Nailing will be anywhere from 4 to 6 nails per shingle, depending on the type of shingle and pitch. This actually equals out to 8 to 12 nails per shingle, once the next course is installed.
  • All penetration flashings are replaced, sealed and painted to match the roof.

Finally, we do the cleanup and finishing touches.


  • Gutters and downspouts are cleaned out as much as possible of roofing debris, nails, etc.
  • A total cleanup and haul away is included. We use steel bed hydraulic dump trailers, which means no wood floors to drop nails through onto your property.
  • The tarps are removed and we sweep the yard areas with large magnets to remove nails, staples, etc.
  • Patio furniture, grills etc are repositioned.
  • The only evidence that we were there is your beautiful new roof.